The roo has been tar papered and is awaiting shingles. Rough electrical has begun.  The lot is due to receive a coat of pavement on Tuesday 11/24. Interior walls are mostly completed, and the concret floor in the apparatus bay has been poured. Some sheetrock has been installed.